First page Back Continue Last page Overview Graphics
Goals
Plant 16,000 trees and shrubs
increase shade
increase floodplain roughness
increase the potential for in-stream structure
provide cooler water
High flood = sediment scour
Increased roughness = sediment deposit
Flood water infiltration= cooler water