Pre-construction baseline monitoring of amphibians
Pre-construction baseline monitoring of amphibians for the I-90 Snoqualmie East Project: Distribution, Detection, Tracking
Slide 2
Slide 3
Preliminary Surveys
Preliminary Surveys Pilot Studies Identified Focal Species Genetic Sampling Monitoring Plan
52 surveys conducted within 1 mile corridor north and south
52 surveys conducted within 1 mile corridor north and south
7 species encountered/22 locations
Slide 6
Pilot studies 2008
Slide 8
Slide 9
Slide 10
Slide 12